{"id":2841,"date":"2026-05-28T11:32:19","date_gmt":"2026-05-28T03:32:19","guid":{"rendered":"http:\/\/47.254.89.255\/?p=2841"},"modified":"2026-05-28T11:32:19","modified_gmt":"2026-05-28T03:32:19","slug":"final-assembly-speed-increase-shenghua-mec320t-80m-shipbuilding-gantry-crane-core-bearing-assembly-fully-in-place","status":"publish","type":"post","link":"https:\/\/shenghuacranes.com\/it\/final-assembly-speed-increase-shenghua-mec320t-80m-shipbuilding-gantry-crane-core-bearing-assembly-fully-in-place\/","title":{"rendered":"Final assembly speed increase | Shenghua MEC320t-80m shipbuilding gantry crane core bearing assembly fully in place"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recently, the MEC320t-80m shipbuilding gantry crane project independently manufactured by Henan Shenghua Heavy duty Crane Co., Ltd. has achieved a milestone breakthrough in the final assembly stage. The three core load-bearing assemblies of the main beam, rigid legs, and flexible legs have all been accurately assembled, and the main structure of the entire machine has been officially formed. The project has entered the critical stage of core lifting unit assembly.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"682\" src=\"http:\/\/47.254.89.255\/wp-content\/uploads\/2026\/05\/1-21-1024x682.jpg\" alt=\"\" class=\"wp-image-2843\" srcset=\"https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/1-21-1024x682.jpg.webp 1024w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/1-21-800x533.jpg.webp 800w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/1-21-500x333.jpg.webp 500w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/1-21-768x512.jpg.webp 768w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/1-21-18x12.jpg.webp 18w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/1-21.jpg.webp 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">As of now, the overall assembly of the main beam has been successfully completed, and the accuracy of the entire structure has been retested to meet the standard. The core load-bearing skeleton of the whole machine has been perfectly formed;<br>The dual side support structures of the rigid and flexible legs are synchronized to achieve precise alignment and assembly, with key indicators such as verticality and coaxiality exceeding design standards, laying a solid foundation for long-term high load operation of the entire machine;<br>The operating mechanism trolley responsible for the core lifting operation of the entire machine is currently in a critical stage of overall assembly. The lifting mechanism and operating mechanism have completed preliminary docking, and various assembly work is progressing in an orderly manner according to plan.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"538\" data-src=\"http:\/\/47.254.89.255\/wp-content\/uploads\/2026\/05\/2-20-1024x538.jpg\" alt=\"\" class=\"wp-image-2844 lazyload\" data-srcset=\"https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/2-20-1024x538.jpg.webp 1024w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/2-20-800x420.jpg.webp 800w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/2-20-500x263.jpg.webp 500w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/2-20-768x403.jpg.webp 768w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/2-20-18x9.jpg.webp 18w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/2-20.jpg.webp 1080w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/538;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-src=\"http:\/\/47.254.89.255\/wp-content\/uploads\/2026\/05\/3-16-1024x682.jpg\" alt=\"\" class=\"wp-image-2845 lazyload\" data-srcset=\"https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/3-16-1024x682.jpg.webp 1024w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/3-16-800x533.jpg.webp 800w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/3-16-500x333.jpg.webp 500w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/3-16-768x512.jpg.webp 768w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/3-16-18x12.jpg.webp 18w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/3-16.jpg.webp 1280w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/682;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"682\" data-src=\"http:\/\/47.254.89.255\/wp-content\/uploads\/2026\/05\/4-9-1024x682.jpg\" alt=\"\" class=\"wp-image-2846 lazyload\" data-srcset=\"https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/4-9-1024x682.jpg.webp 1024w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/4-9-800x533.jpg.webp 800w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/4-9-500x333.jpg.webp 500w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/4-9-768x512.jpg.webp 768w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/4-9-18x12.jpg.webp 18w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/4-9.jpg.webp 1280w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/682;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-src=\"http:\/\/47.254.89.255\/wp-content\/uploads\/2026\/05\/5-10-1024x768.jpg\" alt=\"\" class=\"wp-image-2847 lazyload\" data-srcset=\"https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/5-10-1024x768.jpg.webp 1024w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/5-10-800x600.jpg.webp 800w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/5-10-500x375.jpg.webp 500w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/5-10-768x576.jpg.webp 768w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/5-10-16x12.jpg.webp 16w, https:\/\/shenghuacranes.com\/wp-content\/smush-webp\/2026\/05\/5-10.jpg.webp 1280w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/768;\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">During the final assembly process, advanced assembly techniques such as &#8220;segmented prefabrication, overall assembly, and synchronous verification&#8221; were adopted. In response to the industry difficulties of large span main beams being prone to deformation and high precision requirements for the alignment of rigid and flexible legs, specialized positioning fixtures and precision pre control schemes were deployed in advance. Real time monitoring and adjustment of each docking link during the process to ensure that all core assemblies meet the assembly standards in one go.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, in order to ensure the efficient progress of the final assembly stage, production and quality inspection implement &#8220;team self inspection, process mutual inspection, and special inspection&#8221; acceptance for key processes, while grasping the progress, firmly holding the bottom line of product quality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At present, the project has entered the final assembly sprint stage, with smooth connection and stable pace in each link. In the future, we will continue to closely monitor the core nodes such as the assembly of the operating mechanism trolley and the linkage debugging of the whole machine, steadily promote various work, and ensure that this 320t ultra heavy shipbuilding gantry crane is delivered on schedule with high quality, injecting strong power into the upgrading of the customer&#8217;s shipbuilding capacity.<\/p>","protected":false},"excerpt":{"rendered":"<p>Recently, the MEC320t-80m shipbuilding gantry crane project independently manufactured by Henan Shenghua Heavy duty Crane Co., Ltd. has achieved a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2841","post","type-post","status-publish","format-standard","hentry","category-industry-news"],"_links":{"self":[{"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/posts\/2841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/comments?post=2841"}],"version-history":[{"count":1,"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/posts\/2841\/revisions"}],"predecessor-version":[{"id":2848,"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/posts\/2841\/revisions\/2848"}],"wp:attachment":[{"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/media?parent=2841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/categories?post=2841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/shenghuacranes.com\/it\/wp-json\/wp\/v2\/tags?post=2841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}